Skip to Content

Cabbages Grower Guide

Growing Cabbages: Techniques for Every Season

​​PRODUCTION GUIDELINES FOR 1 HECTARE OF CABBAGES & OTHER BRASSICAS

Cabbages are widely adapted to a wide range of weather conditions hence they can be grown throughout the year in most regions. Cabbages may be planted by direct seeding or transplanting of seedlings. Direct seeding may require up to 2kgs of seed.

Plant spacing: Large headed cultivars 60 – 70cm between rows and 45cm within rows, small to medium headed cultivars 60cm between rows and 30cm within rows.

Seedlings should be transplanted as soon as they reach the desired size. Populations of 40 – 45 000 plants/ha and 55 – 65 000 plants/ha are ideal depending with the cultivars.

For baby cabbage populations of between 80 000 – 100 000 plants per hectare are recommended. Only well hardened round, stocky plants should be used at planting.

Cabbage thrives in well drained moisture retentive loamy soils well supplied with organic matter, ideal soil pH ranges from 5.5 – 6.5

Optimum temperature for growth and development is between 18 – 20 degrees Celsius, it is fairly resistant to frost and can survive at very low temperatures without damage.

0.5 – 2 litres per hectare

Herbicides, Insecticides & Fungicides

ProblemProductMixing rateApplication DetailsPre – Harvest Interval
 

 

Grasses & Some B/L Weeds

Alachlor 48EC

 

3 – 4 litres per hectare

 

Apply as soon as possible after first transplant irrigation and before weeds emerge
S Metolachlor 960EC1.3 – 1.9 litres per hectare

 

Apply as soon as possible after first transplant irrigation and before weeds emerge
 

Grasses Only

Fuzifop 12.5EC

 

0.6 – 2.4 litres per hectarePost emergent against grasses only, use higher rates for perennial grasses
Propaquizafop 10EC0.5 – 2 litres per hectarePost emergent against grasses only, use higher rates for perennial grasses
All Green MatterParaquat 27.6SL

 

 

1 – 2 litres per hectareApply as a post directed spray, it is a non selective herbicide
 

Cutworms

Chlopyrifos 48EC200mls
/100 litres of water
Band spray over row or apply as a cup application at the base of plant7 days
Lambda cyhalothrin 5EC100mls/100 litres of waterBand spray over row or apply as a cup application at the base of plant7 days

 

AphidsDichlorvos
(DDVP) 1000EC

 

 


100mls
/100 litres of water

 

 

F.C.S Repeat as necessary

 

 

 

2days

 

 

Dimethoate 40EC

 

75mls/100 litres of water

 

F.C.S Repeat as necessary at 14 day intervals

 

14 days

 

Malathion 25WP /50EC

 

200grms
/120mls/100 litres of water

 

F.C.S Repeat as necessary

 

7 days

 

Thiamethoxam 25WG200grams per hectareFoliar spray, F.C.S7 days
Bagrada Bug(Diclorvos)
DDVP 1000EC
200mls
/100 litres of water
F.C.S Repeat as necessary2 days
Cabbage MothCarbaryl 85WP

 

Malathion 50EC

200grams
/100 litres of water

250mls per hectare

F.C.S Repeat as necessary

 

F.C.S Repeat as necessary

7 days

 

7 days

 

 

 

 

 

 

 

 

 

 

 

 

 

Diamond Back Moth Larvae

Acephate 75SP180 – 225grams
/100 litres of water
F.C.S Higher rate for higher infestation levels, repeat as necessary
Cartap hydro
chloride 500SP

 

400grams
/100 litres of water

 

Do not exceed 2kgs/ha
/spray Apply as a F.C.S

 

DDVP 1000EC-Will also control semi loop100mls/100 litres of waterF.C.S Repeat as necessary, Higher rates for higher infestation levels
Voltstar 70EC

 

108mls/100 litres of water

 

F.C.S Repeat as necessary

 

Fipronil 20SC

 

250mls per hectare

 

F.C.S Repeat as necessary, start application when eggs or the very first larva seen

 

Lufenuron 5EC

 

25mls/100 litres of water

 

F.C.S Repeat as necessary
Malathion 25WP
/50EC

 

600mls per hectare

 

F.C.S Repeat as necessary
Spear 50SG

 

600grms
/250mls
/100 litres of water

 

F.C.S Repeat as necessary
Chlofenapyr 36SC400ml/haApply after nothing the first signs of infestation7days
 

 

 

Downey Mildew

Copper Oxychloride 85WP400grams
/100 litres of water
Repeat as necessary at 10 -14 day intervals

 

3 days

 

 

Mancozeb 80WP

 

200grams
/100 litres of water

 

Repeat as necessary at 7 -14 day intervals

 

14 days
Blight cure 72WP250grams
/100 litres of water
Spray maximum of 3 sprays/crop at 7 – 10 day intervals
NB: CARBARYL 85WP WILL ALSO CONTROL SEMI LOOPERS, GRASS HOPPERS, LEAF EATING CATERPILLARS, CRICKETS WITH THE SAME RATE AS ON CABBAGE MOTH CHLOPYRIFOSAS MENTIONED ABOVE, WILL ALSO CONTROL FALSE WIREWORMS, WHITE GRUBS USING SAME RATE AS THAT ON CUTWORMSH
ThripsCartap hydrochloride 500SP400grams
/100 litres of water
F.C.S at 7 day intervals. Do not exceed 2kgs/hectare7 days
 

 

Thrips

DDVP 1000EC

 

100mls/100 litres of water

 

F.C.S Apply as a high volume spray. Repeat if pest persists2 days

 

Diazinon 30EC

 

120mls/100 litres of water

 

F.CS Repeat as necessary

 

10 days
Malathion 50EC250mls/100 litres of waterF.CS Repeat as necessary

 

10 days
White FlyDDVP 1000EC100mls/100 litres of waterF.C.S Repeat as necessary2 days
Damping offThiram 80WP100grams
/50kgs of seed
This is a seed dressing treatment
 

 

 

Red Spider Mites

 

Abamectin 18EC220mls/100 litres of waterF.C.S in 300 – 600 litres of water/Ha spray mix. Repeat if mites persist
Diazinon 30EC190mls/100 litres of waterF.C.S Repeat at 10 day intervals14 days
Volt star 70EC/Spear 1.92EC
/50SG
250ml/400
/300g in 200 litres of water per ha
F.C.S Repeat as necessary 14 days
Dimethoate 40EC80mls/100 litres of waterF.C.S Repeat as necessary14 days
Malathion 25WP/50EC200grams
/120mls/100 litres of water
F.C.S Repeat as necessary7 days

Approximately 12.5 x 16 litre knapsacks will cover 1 hectare and apply 200 litres of water.

ALWAYS READ LABELS BEFORE USING THE PRODUCTS